
Aura – The City of Colour is located South of Caloundra and connected to Caloundra Road by the new Bells Creek Arterial Road. Eventually this will link to the Roys Road Intersection on the Bruce Highway. This Stockland development will have an estimated 20,000 home sites. It will also have 200km of cycle ways and an estimated 5 schools in the area when it is completed.
Ford Brothers have been involved with the 3 main contractors that are working directly for Stockland’s.
Shadforth Civil
- 1100m Main Roads acoustic barrier at a maximum height of 3800mm along with 2000m of various main roads chain wire fencing.
- 1500m of cycleway fencing and various other types of fencing including frog fencing, deflection rails, handrails and bollards.
Hall Contracting
- Chain wire fencing and shade cloth fencing.
Eureka Landscaping
- Main Roads acoustic barriers as well as decorative acoustic barriers and estate fencing.
We worked with the landscape architects in the design stages to get their desired outcome at time of construction. We also installed numerous amounts of bollards and locking rails around the parks and waterways in the area.